Typical Tire Handling Carousel Configurations
Note that these are typical dimensions. Carousels are manufactured to your particular application.

Carrier Type | Tire Size | Link Spacing |
---|---|---|
Small | 14 - 26" | 11 |
Medium | 20 - 28" | 14 |
Large | 26 - 33" | 17 |
Height | Links | Small | Medium | Large |
---|---|---|---|---|
9'10" | 70 | 6 | 5 | 4 |
11'10" | 86 | 7 | 6 | 5 |
13'10" | 102 | 9 | 7 | 6 |
15'7" | 116 | 10 | 8 | 6 |
16'10" | 126 | 11 | 9 | 7 |
18'7" | 140 | 12 | 10 | 8 |
20'4" | 154 | 14 | 11 | 9 |
Considerations for installation:
- Dock access is needed for unloading the machinery.
- A significant amount of the installation is completed prior to standing the machine, while it is still on its side on the floor.
- On average, a 30’ x 40’ area should be cleared and available for the installation process.
- 12" of clearance from the top of the machine to the ceiling is needed to stand the machine. (Building codes in some areas require clearance up to 18".)
- A 3,000 lb forklift truck is required for equipment installation.
- The average installation takes about six hours once the machinery is off the truck.
- Electrical requirements: 480V/230V (+/- 10%), 3-phase, 60 Hz, 20 amp. dedicated circuit.
- Hardwire or plug capabilities, with NEMA L15-20R socket is needed for plug-in.
- Care is taken to make sure the machine is square and level and that the appropriate safety accessories are installed.
- Thunderstuds are used to secure the machinery to the floor (length is determined by seismic considerations).
- During the test run, final adjustments are made to insure that the chain has proper tension and that the hooks and carriers are properly installed.
- Once the installation is complete, the area will be cleaned of shipping materials and debris.
- As a final step, our installer will provide Product Knowledge Training to the appropriate personnel.