Site & structural prep |
- Floor flatness and level tolerance: base must be precisely leveled to avoid stresses or binding
- Floor capacity: account for static and dynamic loads
- Foundation anchoring: ensure the slab and anchors can stabilize the structure
- Clear height & envelope: avoid overhead obstructions during design and installation phases
- Access clearance: maintain space for transport, cranes, and maintenance
|
Site readiness prevents installation delays. Ceiling height and footprint planning are critical to success.
|
Mechanical structure & guide systems |
- Guide rail alignment: rails must be plumb and parallel
- Support frames: resist lateral loads and vibration
- Rigidity & stiffeners: use cross-bracing to reduce deflection
- Drive train tensioning: properly adjust chains or belts
|
Hänel systems use multi-point suspension extractors and low-friction surfaces. Hänel quality construction and shipping processes help ensure a damage-free unit.
|
Container and tray configurations |
- Container sizing & weight distribution: balance loads evenly
- Container guidance: install side guides and stops accurately
- Test trays: verify motion and alignment under load
|
Hänel multifunction containers range from approximately 550 to 2,200 pounds capacity. They can be configured on installation, and can also be adapted as your loads change.
|
Electrical and controls integration |
- Power feed/wiring: verify voltage and current capacity
- Control hardware installation: ensure proper orientation and cooling
- Communication interfaces: test Ethernet or serial links
- Safety circuits: connect and test e-stops, door locks, and light curtains
|
Hänel controllers can operate standalone or networked with WMS.
|
Calibration & commissioning |
- Level / plumb verification: use laser instruments
- Motion testing: run under incremental loads
- Limit switch verification: check stops, stalls, and fault states
- Speed tuning: optimize acceleration and deceleration profiles
|
Testing under load ensures smooth operation and reliability.
|
Safety factors |
- Guarding & enclosures: prevent access to moving parts
- Light curtains / sensors: protect access zones
- Emergency stops & lockouts: verify operation
- Fire protection: maintain sprinkler clearances
|
Work with any present fire or other safety solutions.
|
Training & handoff |
- Operator training: daily checks and safe operation
- Maintenance training: lubrication and adjustments
- Documentation: provide schematics and maintenance schedules. We can help you schedule maintenance from the moment of go-live to ensure your system is reliable
- Site factors: ensure a tidy, clean installation area
- Acceptance testing: complete punch list and sign-off
|
Hänel installations are performed by certified partners trained in factory standards. Cisco-Eagle is a certified and qualified Hänel installation partner
|